Dubai Electricity and Water Authority PJSC Announces Record Breaking First Half 2024 Results
이 글자크기로 변경됩니다.
(예시) 가장 빠른 뉴스가 있고 다양한 정보, 쌍방향 소통이 숨쉬는 다음뉴스를 만나보세요. 다음뉴스는 국내외 주요이슈와 실시간 속보, 문화생활 및 다양한 분야의 뉴스를 입체적으로 전달하고 있습니다.
DUBAI, United Arab Emirates -- Businesswire -- Dubai Electricity and Water Authority PJSC (ISIN: AED001801011) (Symbol: DEWA), the Emirate of Dubai’s exclusive electricity and water services provider, which is listed on the Dubai Financial Market (DFM), today reported its first half 2024 consolidated financial results, recording revenue of AED 13.7 billion, EBITDA of AED 6.6 billion, operating profit of AED 3.3 billion and profit after tax of AED 2.6 billion.
DEWA’s first half consolidated revenue increased by 7.3% to a record AED 13.7 billion in 2024, compared to first half of 2023 and this was mainly driven by an increase in demand for electricity, water and cooling services. Consolidated first half net profit was down 6.7% to AED 2.6 billion mainly due to higher depreciation and the first-time application of corporate tax in 2024. DEWA’s second quarterly consolidated revenue increased by 7.8% to AED 7.9 billion in 2024. EBITDA for the second quarter was up by 8.8% to AED 4.0 billion, and Profit before Tax was up by 5.9% to AED 2.1 billion.
Gross power generation in the first half of 2024 was 25.5 TWh marking an increase of 6.7% over 23.9 TWh generated in the same period in 2023. Out of the above, green energy was 3.3 TWh, representing 12.9% of total generation in 2024. As of 30th June 2024 there were 1,236,845 Electricity and Water customer accounts representing an increase of 52,134 (4.4%) over the number of customer accounts as on 30th June 2023. DEWA’s total desalinated water production in the first half of 2024 reached 71.3 billion Imperial Gallons, which is 4.3% increase compared to the same period of 2023.
By the end of the first half of 2024, the company’s installed generation capacity reached 16.779 GW including 2.86 GW representing renewable energy capacity. The company’s installed desalinated water production capacity was unchanged at 495 MIGD.
DEWA’s audited financials can be found at DEWA’s website: https://www.dewa.gov.ae/en/investor-relations
*Source: AETOSWire (https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.aetoswire.com%2Fen%2Fnews%2Fdewa08082024&esheet=54106535&newsitemid=20240808038686&lan=en-US&anchor=AETOSWire&index=2&md5=240172d29b70d94de94f492a3723e1e6)
View source version on businesswire.com: https://www.businesswire.com/news/home/20240808038686/en/
이 뉴스는 기업·기관·단체가 뉴스와이어를 통해 배포한 보도자료입니다.
출처:Dubai Electricity and Water Authority PJSC
보도자료 통신사 뉴스와이어(www.newswire.co.kr) 배포
Copyright © 뉴스와이어. 무단전재 및 재배포 금지.
- 도쿄관광한국사무소, 도쿄를 환하게 수놓는 겨울 이벤트의 대명사 ‘Roppongi Hills Christmas 2024’ 소
- 한국요꼬가와, 생물의약품 내 미세 입자 분석을 위한 Flow Imaging Microscopy 웨비나 개최 - 뉴스와이
- LG에너지솔루션 버테크, 대규모 ESS 프로젝트 공급 계약 체결 - 뉴스와이어
- 두산에너빌리티, 한전KPS와 ‘가스터빈 서비스 사업’ 협력한다 - 뉴스와이어
- 플라스틱프리, 흑백정육왕 챌린지로 친환경 캠페인 동참 - 뉴스와이어
- 한 해의 끝에서 정영환 작가와 푸른 숲이 전하는 위로와 휴식, 삼원갤러리 ‘TIMELESS BLUE’ 개최 -
- 현대엘리베이터, 승강기 유지관리대수 20만 대 돌파 - 뉴스와이어
- 레드페이스, 배색 포인트로 스타일 더한 기능성 아웃도어 재킷 출시 - 뉴스와이어
- AI 기반 근감소증 예측 솔루션 바이오바이츠, Seed 라운드 마무리… 6억 투자유치 성공 - 뉴스와이
- 삼성전자 ‘지스타 2024’에서 오디세이 모니터 체험존 ‘All Ready. OLED’ 운영 - 뉴스와이어