DENMARK BRIDGE DEMOLISHED

moa 2023. 11. 3. 20:46
글자크기 설정 파란원을 좌우로 움직이시면 글자크기가 변경 됩니다.

이 글자크기로 변경됩니다.

(예시) 가장 빠른 뉴스가 있고 다양한 정보, 쌍방향 소통이 숨쉬는 다음뉴스를 만나보세요. 다음뉴스는 국내외 주요이슈와 실시간 속보, 문화생활 및 다양한 분야의 뉴스를 입체적으로 전달하고 있습니다.

Bridge demolished to avoid flooding of treatment plant in Denmark

epa10955883 An aerial view taken with a drone shows the demolishing of a bridge at Ormslevvej to prevent the Viby Wastewater Treatment Plant from being flooded in Viby, near Aarhus, eastern Jutland, Denmark, 03 November 2023. In order to prevent the Viby Wastewater Treatment Plant from being flooded, and to avoid getting sewage all over the place and backing up through the pipes, the bridge at Ormslevvej is being removed. It must ensure a greater flow to Doede Aa (Dead River). The bridge is located at the mouth of the Viby Wastewater Treatment Plant, which after a long period of heavy rainfall is under heavy pressure. EPA/Mikkel Berg Pedersen DENMARK OUT

▶제보는 카톡 okjebo

Copyright © 연합뉴스. 무단전재 -재배포, AI 학습 및 활용 금지

이 기사에 대해 어떻게 생각하시나요?