LG Energy Solution may replace SK On in Turkey battery venture
전체 맥락을 이해하기 위해서는 본문 보기를 권장합니다.
A spokesperson for LG Energy Solution said that the company is currently in discussions with Ford regarding possible cooperation, but added "nothing has been decided yet."
"Whether the negotiation would be halted is yet to be decided."
이 글자크기로 변경됩니다.
(예시) 가장 빠른 뉴스가 있고 다양한 정보, 쌍방향 소통이 숨쉬는 다음뉴스를 만나보세요. 다음뉴스는 국내외 주요이슈와 실시간 속보, 문화생활 및 다양한 분야의 뉴스를 입체적으로 전달하고 있습니다.
LG Energy Solution, a battery maker, may build a manufacturing plant in Turkey with Ford, according to a Bloomberg report Monday.
The U.S. carmaker initially signed a memorandum of understanding (MOU) with SK On for the project last year, but the previous deal appears to have fallen through. Local media reports cited the unfavorable market conditions.
A spokesperson for LG Energy Solution said that the company is currently in discussions with Ford regarding possible cooperation, but added “nothing has been decided yet.”
In March last year, SK On signed an MOU with Ford and Istanbul-based Koc Holding to establish a joint venture for electric vehicle (EV) battery manufacturing plant in Turkey.
The initial plan was to build a lithium-ion battery production plant in Ankara, a city southeast of Istanbul and the capital of the country, with an annual capacity of 30 to 45 gigawatt-hours.
SK On has been considering pulling back from the project as market conditions worsen, according to local media reports on Monday.
“We have been discussing the joint venture in Turkey since the signing of the MOU in March last year, but the discussions have not reached a conclusion yet,” said an SK On spokesperson.
“Whether the negotiation would be halted is yet to be decided.”
SK On recently announced that it will raise 2.8 trillion won ($2.25 billion) through a rights offering, 2 trillion won of which will be provided by SK Innovation. SK On initially hoped to raise 3 to 4 trillion won in a pre-initial public offering funding round, but failed to meet the target due to global market contraction.
The battery maker will continue to work with Ford in other ongoing joint projects.
SK On is building EV battery manufacturing plants in Kentucky and Tennessee with Ford through the BlueOval SK joint venture.
LG Energy Solution and Ford may sign an MOU for the project in a few weeks, said Bloomberg in its Monday report, citing unnamed industry sources.
Details for the Turkish project are likely to remain similar to the initial plan with SK On.
LG Energy Solution recently issued preliminary fourth quarter results.
The battery maker’s operating profit for the fourth quarter stood at 237.4 billion won, up 213 percent on year, missing the market consensus. But its annual operating profit is estimated at a record 1.2 trillion won, up 57.9 percent on year.
On Tuesday, Kospi-listed LG Energy Solution’s share price rose 2.05 percent to 473,500 won.
BY SHIN HA-NEE [shin.hanee@joongang.co.kr]
Copyright © 코리아중앙데일리. 무단전재 및 재배포 금지.
- Three individuals accused of working with North Korean agents
- Man charged with murder of taxi driver, ex-girlfriend makes first public appearance
- Suga departs
- Seven years and 12 EPs later, SF9 is still going strong
- NewJeans caught in cultural appropriation brouhaha over hanji
- Yet-to-debut K-pop girl groups may push aside idols that are so 2022
- Korean stocks open higher on eased woes over Fed's rate hikes
- Meet the woman behind girl group IVE who dared to redefine the production process
- Accused taxi murderer was filmed torturing a cat
- DP leader Lee Jae-myung maintains innocence as he goes in for questioning