Doosan Heavy gets maintenance contract in UAE
이 글자크기로 변경됩니다.
(예시) 가장 빠른 뉴스가 있고 다양한 정보, 쌍방향 소통이 숨쉬는 다음뉴스를 만나보세요. 다음뉴스는 국내외 주요이슈와 실시간 속보, 문화생활 및 다양한 분야의 뉴스를 입체적으로 전달하고 있습니다.
Doosan Heavy Industries & Construction signed a deal to do maintenance on a reactor at the Barakah nuclear power plant in the United Arab Emirates (UAE).
The company announced Thursday that it will conduct maintenance on the turbines, generators and other major systems of the unit 1 reactor of the Barakah nuclear power plant in Al Dhafra.
The unit 1 reactor started commercial operations in April and maintenance will be conducted between next April and June.
The plant is the UAE's first nuclear power plant and the first Korean nuclear plant export.
Once all four units of the Barakah plant are commercially operating, Doosan Heavy Industries & Construction plans to conduct maintenance on the entire power plant every two to three years.
The deal was signed in line with an agreement between Doosan Heavy Industries & Construction and Nawah Energy Company in June 2019 to conduct maintenance on all four Barakah reactors. The two companies agreed to sign a new maintenance service deal for each of the four nuclear reactors of the Barakah plant.
Nawah Energy Company is a joint venture betweenthe Emirates Nuclear Energy Corporation and Korea Electric Power Corporation, started in 2016.
BY LEE TAE-HEE [lee.taehee2@joongang.co.kr]
Copyright © 코리아중앙데일리. 무단전재 및 재배포 금지.
- Han So-hee says goodbye to pretty and hello to blood, sweat and tears
- Actor Kim Seon-ho apologizes for pressuring ex to have abortion
- Abortion claim being checked by Kim Seon-ho's agency
- Galaxy Z Flip 3 now comes in 49 color combinations
- Kim Joo-ryoung calls 'Squid Game' a reward for her dedication to acting
- Young people's deaths after Pfizer vaccines are new worry
- Edison Motors is preferred bidder for SsangYong Motor
- After 512 episodes, Yumi and her cells say their final goodbye
- K-pop stars break silence on hurtful online comments
- Explore everything defense and aerospace at ADEX 2021